| DURALINE
Z-100 INSTALLATION INSTRUCTIONS
SURFACE
PREPARATION
A. Surface to
be lined must be cleaned free of all dirt, oil, grease, and flaking rust.
B. Wash surface with water and allow to complete drying. This should be
done just prior to installation of wire mesh.
APPLICATION OF WIRE MESH
A. Use 1 1/2" #9 Flattened expanded metal mesh, or something similar
in wire mesh.
B. Tack the wire mesh on 18” center, or thereabouts, to the above
prepared metal surface.
C. With a chisel, or some tool, raise (pry) the wire mesh away from the
metal surface and inset a 1⁄2” thick nut, small metal scrap,
or something to keep the mesh off the metal surface so that the mixed
Duraline Z-100 can get below the mesh, and thus the wire mesh will be
imbedded in the desired thickness of the Duraline Z-100 .
MIXING & APPLICATION OF Z-100 HEAVY DUTY LINING
A. Mix the Duraline Z-100 heavy duty chute lining as required in a mortar
box with water. Add water sparingly as best results are obtained when
consistency of mix is “stiff.”
B. Apply over wire mesh, prepared above, to required thickness.
C. Finish surface with steel trowel.
CURING OF Z-100 HEAVY DUTY LINING
For best results, wet-cure for 72 hours.
A. Allow to dry at ambient temperature for 4-6 hours.
B. Apply cloth to surface and wet periodically over the next 48 hours.
C. Allow 18 to 24 hours drying (no water added) at ambient temperature
prior to using.
Coverage
of Duraline Z-100 is 12 pounds per square foot at 1” thickness.
|